Recently, Guangdong's centralized wind power and other new energy sources have been 'exerted', with the maximum power reaching 11.56 million kilowatts, a year-on-year increase of 67%, lasting nearly 300 minutes.
On October 10th, due to the influence of cold air going south, the wind power in most coastal areas of Guangdong was strong, and the maximum power of wind power reached 9.16 million kilowatts, of which the maximum wind power of offshore wind power reached 5.45 million kilowatts.
It is understood that Guangdong Power Grid Corporation of China Southern Power Grid has done a good job in the grid-connected service of new energy, and implemented the principle of 'all new energy should be combined, and more and more new energy should be generated'. Before dealing with the peak of new energy power, it accurately predicted the peak of new energy power through Fengguang New Energy Technology System, and the predicted results were basically consistent with the actual situation. It reasonably arranged the start-up and shutdown of the system and the operation mode of the system, and ensured the safe and stable operation of Guangdong power system, the orderly supply of electricity and the consumption of new energy by means of pumped storage.