• Company Profile
  • Company Culture
  • Qualification Honor
  • 最近案例
  • 经典案例
  • Social Responsibility Report
  • Sales Service
  • Sales Network
  • Q&A
  • Talent Mindset
  • Jobs
  • 师资队伍
  • Contact Us
News & info News

Meihekou city's second new energy vehicle power station was officially put into operation

日期: 2022-09-21
浏览次数: 0

You have contributed a lot to the power station being put into operation as scheduled. It took only 13 days to complete the task of changing the power supply of the power station, which praised your construction speed and service … 'On September 17th, the new energy vehicle changing station of meihekou city Convention and Exhibition Center was officially put into operation. Zhao Jinliang, the person in charge of the changing station operation, told Xu Hongtao, a staff member of Tonghua Power Supply Company.

 

This year, meihekou city plans to purchase 2,000 new energy vehicles. In June, meihekou city Changjiang Road New Energy Vehicle Replacement Station was officially put into operation, which can replace batteries for about 300 vehicles every day. With the continuous increase of new energy vehicles, the pace of power station replacement construction is gradually accelerated. On August 25th, after learning that the meihekou city Municipal Government will build a new energy vehicle for power station in the Convention and Exhibition Center, Tonghua Power Supply Company immediately arranged for professionals to come to the door for docking to understand the electricity demand. According to the planning of meihekou city, the company immediately started the multi-disciplinary coordination mechanism such as policy development, marketing, design, transportation and inspection, and completed the on-site investigation, design, project establishment and power supply scheme formulation within 2 days. The company's meihekou city Power Supply Center played a territorial role, actively coordinated with meihekou city government, provincial electric vehicle companies and equipment manufacturers, organized 160 person-times of on-site survey, acceptance and commissioning, and solved seven problems such as site selection, power supply path and metering device.

 

In the process of power supply construction of the power exchange station, the company adopted the measures of inverted construction period to overcome the difficulties of epidemic situation, slow arrival of equipment and rainy days, and often had to carry out the installation of cable conduits and power cables, box-type distribution stations, etc. at the temperature of 28 degrees above zero. In order to grab the construction progress, the staff will arrive at the scene at dawn, and the construction will last until 10 o'clock at night at the latest.

 

After 13 days of continuous operation, the company's staff laid 412 meters of cable conduits, installed 468 meters of power cables, made 26 cable joints, newly built 4 630 kVA box-type power distribution stations and 1 ring network cabinet, leveled the ground of about 300 square meters, completed the power supply construction of the convention and exhibition center substation ahead of schedule, and achieved the 'electrifying speed'.

 

'New energy vehicles not only save money and protect the environment, but also take only 2 minutes to change electricity, which saves time than refueling.' Master Wang, a taxi driver who changed the battery in the power station of meihekou city Convention and Exhibition Center, said.


Hot News / 热点新闻
2018 - 01 - 05
点击次数: 41
The assembly shop is responsible for assemble parts into a completed unit. The production program indicates 30JPH. For interior decoration assembly line, 6800*4400mm skateboard line is adopted (better...
2018 - 01 - 05
点击次数: 25
B1B2 compact coating technique, the most advanced technique at present, is used. Imported robots are employed in the plants with the automation rate of 90%. For colored paint, the plant uses eco-frien...
2018 - 01 - 05
点击次数: 26
A mass production assembly line, imported robots from KUKA are used in the plant. Robotic automation in welding reaches 90%. Overhead EMS mechanized transport chains are adopted among the assembly lin...
2018 - 01 - 05
点击次数: 19
It mainly manufactures the bodywork stamping parts. In the plant, there is one four-order high speed XL automatic closed stamping line and two underground waste lines. For open blanking production lin...
2017 - 12 - 25
点击次数: 51
Recently, auto-driving has become a heated topic. Soom after Beijing announced the first auto-driving law in the country, Baidu and Xiongan has partnered together to ‘do something big’, They announce ...
Links:
Scan and follow us
Copyright ©2005 - 2018 Nanjing A.E New Energy Intelligent Automobile Manufacturing Co., Ltd.Su ICP, No. 18005293
犀牛云提供云计算服务