• Company Profile
  • Company Culture
  • Qualification Honor
  • 最近案例
  • 经典案例
  • Social Responsibility Report
  • Sales Service
  • Sales Network
  • Q&A
  • Talent Mindset
  • Jobs
  • 师资队伍
  • Contact Us
News & info News

Improving the charging efficiency of charging piles to help the development of new energy automobile

日期: 2022-04-06
浏览次数: 0

On the evening of March 14th, Ms. Guo, who lives in a certain district of Kunshan City, submitted an Application for 'charging pile installation' for her own parking space through the 'Online State Grid' app. What she didn't expect was that the charging pile installation was successfully completed on March 18th.

It is understood that Ms. Guo often needs to transport her children to and from school. In order to save money and be more environmentally friendly, she recently booked an electric car instead of walking.

She learned from the residential property that she can submit an Application for charging pile installation to the power supply company through the 'Online State Grid' app. At around 18: 00 on March 14th, she submitted the Application for 'charging pile installation' on the app. At 8: 07 the next morning, Ms. Guo, who was still having breakfast, received a phone call from the staff of Kunshan Power Supply Company of State Grid for data verification.

 

While verifying the materials, the staff also helped Ms. Guo to complete some materials. At 11: 58 on March 15th, Ms. Guo received a phone call to make an appointment for an afternoon visit. 'Because I have to go to work that afternoon, I can only make an appointment for my power supply brother to come back to see me at 9: 00 the next morning ...'

At 8: 34 on March 16th, Shen Yuming, an employee of the power supply office of Kunshan Power Supply Company Development Zone of State Grid, came to Ms. Guo's residential area early to conduct on-the-spot investigation of the parking space. Shen Yuming designed an optimal power connection scheme for Ms. Guo: Since Ms. Guo's underground parking space is about 100 meters away from the community power distribution room, in order to save money for installation, it was decided to take a bus directly from the power distribution room and install a new centralized metering box closer to the parking space. In this way, the charging pile wired to Ms. Guo has been shortened by almost half, which can save Ms. Guo an installation cost. At the same time, the newly installed metering box has reserved access points for the other three parking spaces around.

At 9: 46 on March 17th, Ms. Guo received the notice of acceptance and implementation of the project and made an appointment again. At 16 o'clock the next day, the power supply personnel rushed to the scene, and it took about 40 minutes to complete the installation.

'I thought I'd have to wait a long time, but I didn't expect the new car to be mentioned, and the pile would be fine!' Grateful Ms. Guo posted a post on the local 'Kunshan Forum', recorded the incident, and praised the service of the power supply company. 'I'm surprised by the speed of the power grid, and like this speed. Awesome! '

Ms Guo's power consumption experience in Kunshan City is only a case of national grid service. In recent years, State Grid Jiangsu Electric Power has focused on the hot issue of people's livelihood, such as 'charging piles for residents', and has made continuous efforts to simplify the charging process and the construction of charging facilities in residential areas, so that customers can truly feel the meticulous service of State Grid, and realize the convenience of electricity utilization to the maximum extent. State Grid Jiangsu Electric Power has also promoted the government's renovation of old residential areas and the planning and renovation of charging facilities, and actively funded the construction and renovation of residential power supply and distribution facilities to ensure that the charging piles for residents can be installed.


Hot News / 热点新闻
2018 - 01 - 05
点击次数: 41
The assembly shop is responsible for assemble parts into a completed unit. The production program indicates 30JPH. For interior decoration assembly line, 6800*4400mm skateboard line is adopted (better...
2018 - 01 - 05
点击次数: 25
B1B2 compact coating technique, the most advanced technique at present, is used. Imported robots are employed in the plants with the automation rate of 90%. For colored paint, the plant uses eco-frien...
2018 - 01 - 05
点击次数: 26
A mass production assembly line, imported robots from KUKA are used in the plant. Robotic automation in welding reaches 90%. Overhead EMS mechanized transport chains are adopted among the assembly lin...
2018 - 01 - 05
点击次数: 19
It mainly manufactures the bodywork stamping parts. In the plant, there is one four-order high speed XL automatic closed stamping line and two underground waste lines. For open blanking production lin...
2017 - 12 - 25
点击次数: 51
Recently, auto-driving has become a heated topic. Soom after Beijing announced the first auto-driving law in the country, Baidu and Xiongan has partnered together to ‘do something big’, They announce ...
Links:
Scan and follow us
Copyright ©2005 - 2018 Nanjing A.E New Energy Intelligent Automobile Manufacturing Co., Ltd.Su ICP, No. 18005293
犀牛云提供云计算服务