• Company Profile
  • Company Culture
  • Qualification Honor
  • 最近案例
  • 经典案例
  • Social Responsibility Report
  • Sales Service
  • Sales Network
  • Q&A
  • Talent Mindset
  • Jobs
  • 师资队伍
  • Contact Us
News & info News

The 9th (2022) China (Changsha) new energy application and smart energy innovation and Development S

日期: 2022-01-14
浏览次数: 1

On January 12, the 9th (2022) China (Changsha) new energy application and smart energy innovation and Development Summit Forum was held in Changsha. The forum focuses on 'new technology, new model and new business form of new energy industry', aiming to explore the development status, development trend, development difficulties and Countermeasures of new energy industry.

With the theme of 'practicing the dual carbon goal and accelerating energy transformation', the forum conducted in-depth exchanges on the development trend, industrial mode, technical path, pain points and difficulties of new and renewable energy in Hunan, focusing on accelerating the construction of a new power system with new energy as the main body and realizing the strategic goal of green, low-carbon and high-quality development of energy in Hunan.

In 2021, the installed capacity of new energy power generation in the province reached 13.65 million KW, with a year-on-year increase of 2.21 million KW, becoming the absolute main force for the growth of power installed capacity in the province. Among them, the installed capacity of wind power, photovoltaic and biomass power generation reached 8.03 million KW, 4.51 million KW and 1.11 million KW respectively. The proportion of new energy in the total installed capacity of power supply increased to 25.2%. The province's new energy power generation reached 23.5 billion kwh, accounting for 13.5% of the province's total power generation, an increase of 2.8 percentage points year-on-year. Among them, wind power generation reached 15 billion kwh, photovoltaic and biomass power generation reached 3.8 billion kWh and 4.7 billion kwh respectively.

More than 300 domestic experts, scholars and new energy power generation and equipment manufacturing enterprises in the province participated in the forum. At the same time, it was broadcast live on a professional platform, attracting nearly 5000 viewers to attend the meeting online.


Hot News / 热点新闻
2018 - 01 - 05
点击次数: 42
The assembly shop is responsible for assemble parts into a completed unit. The production program indicates 30JPH. For interior decoration assembly line, 6800*4400mm skateboard line is adopted (better...
2018 - 01 - 05
点击次数: 26
B1B2 compact coating technique, the most advanced technique at present, is used. Imported robots are employed in the plants with the automation rate of 90%. For colored paint, the plant uses eco-frien...
2018 - 01 - 05
点击次数: 27
A mass production assembly line, imported robots from KUKA are used in the plant. Robotic automation in welding reaches 90%. Overhead EMS mechanized transport chains are adopted among the assembly lin...
2018 - 01 - 05
点击次数: 20
It mainly manufactures the bodywork stamping parts. In the plant, there is one four-order high speed XL automatic closed stamping line and two underground waste lines. For open blanking production lin...
2017 - 12 - 25
点击次数: 52
Recently, auto-driving has become a heated topic. Soom after Beijing announced the first auto-driving law in the country, Baidu and Xiongan has partnered together to ‘do something big’, They announce ...
Links:
Scan and follow us
Copyright ©2005 - 2018 Nanjing A.E New Energy Intelligent Automobile Manufacturing Co., Ltd.Su ICP, No. 18005293
犀牛云提供云计算服务